The Project of Sewage treatment System Design and Planning in Villages or Amusement Parks of Shihmen Reservoir Watershed

Absrtact
1.In order to improve Shihmen reservoir wastewater discharge, Environmental Protection Administration (EPA) come up with “The project of sewage treatment system design and planning in villages or amusement parks of Shihmen reservoir watershed” project (the Project). An investigation of water quality, water volume and other environmental background information was performed in Shihmen reservoir’s pollution sources through this Project. Water quality purification construction planning for domestic and touring wastewater, Site investigation, Feasibility study, Basic design and Detail design were performed in amusement or population concentrated areas start with Lungjuwan、Baiji(Amuping)and the village of Luofu etc. 2.The Project already has done basic investigation and analysis on environmental information to find an applicable process for three project areas by conducting investigation on pollution sources and distribution and sampling water quality in polluted branches and case study research in countries. 3.Assisting and providing consulting services for those industries restrained by Water Pollution Control Act in project areas to design and install the grease interceptor and related facilities for wastewater treatment. One orientation has been performed and guided twelve new restaurants setting up wastewater treatment facilities. 4.According to examination results on water quality, water volume and site pollution characters, selected “Wastewater treatment system of Luofu(the village of Luofu elementary school)”, “Wastewater treatment system of Luofu(Earth God temple of Luofu)”, “Wastewater treatment system of Luofu(the village of Luofubridge)” and “Wastewater treatment system of Baiji” engineering methods and design. For demonstration purpose, also provide additional phosphorus removal facility drawings and regulations for references. 5.Four water treatment facilities expected to complete in this Project for 710CMD total design capacity which can reduce BOD, NH3-N and total phosphorus to 16.76 kg/day, 2.65 kg/day and 0.57 kg/day in Shihmen reservoir watershed upstream. Plus the control of untreated wastewater discharged by restaurants can also improve water quality for Taipei and Taoyuan.
Keyword
Pollution prevention for river, lakes and reservoirs,Reformed soil treatment,Precast building sewage treatment facility
Open
top